Show findcourses.co.uk as: Mobile

Unconventional Resources Completion and Stimulation - URCS

PetroSkills
Course summary
5 days
4,325 USD
Calgary, Denver, Houston, Pittsburgh
07/10/2019
Open / Scheduled
Course Dates
Houston
07/10/2019  
4,325 USD
07/10/2019  
4,325 USD

Course description

Horizontal wells have become the industry standard for unconventional and tight formation gas reservoirs. Because these reservoirs have poorer quality pay, it takes a good, well-planned completion and fracture stimulation(s) to make an economic well. Even in a sweet spot in the unconventional and tight gas reservoir, good completion and stimulation practices are required; otherwise, a marginal or uneconomic well will result. But what are good completion and stimulation practices in horizontal wells in these unconventional reservoirs? What are the objectives of horizontal wells and how do we relate the completion and stimulation(s) to achieving these goals? How many completions/stimulations do we need for best well performance and/or economics? How do we maximize the value from the horizontal wells? When should a horizontal well be drilled longitudinally or transverse? These are just a few questions to be addressed during this course. This course will focus on some of the key elements of well completions and stimulation practices as they apply to horizontal wells in tight and unconventional reservoirs. Optimization studies will be shown and used to highlight the importance of lateral length, number of fractures, inter-fracture distance, fracture half-length, and fracture conductivity. These results will be used to discuss the various completion choices such as cased and cemented, open hole with external casing packers, and open hole pump and pray techniques. This course also will address key risks to horizontal wells and develop risk mitigation strategies so that project economics can be maximized. In addition, tight and unconventional gas field case studies will be used to illustrate the application of these design, optimization, and risk mitigation strategies for horizontal wells in tight and unconventional gas reservoirs.

Suitability - Who should attend?

Petroleum and production engineers, completion engineers, stimulation engineers, geologists, managers, technical supervisors, service and support personnel.

Training Course Content

Geo-mechanics: what makes an unconventional shale reservoir prospective; Introduction to the completions and multiple fracture stimulated horizontal wells; Horizontal well objectives in Unconventional Reservoirs; Basis of fracture design in horizontal wells; Horizontal well stimulation objectives; Completion planning for horizontal wells; Horizontal well risks and risk mitigation strategies; Horizontal well case histories

About provider

PetroSkills - Oil & Gas Training Courses

PetroSkills was founded in 2001 as an alliance between BP, Shell and OGCI, aiming to accomplish a mission of vital importance for the future of the Oil & Gas industry. PetroSkills provide high quality professional training and courses that are...


Read more and show all courses with this provider

Contact info

PetroSkills

Tulsa

 Show phone number
www.petroskills.com


Reviews

Reservoir Engineer
(4)
Very thorough overview of the entirety of the completion/stimulation process. Great course!
Reservoir Engineer
(4)
I thought this was an excellent course.
Senior Technical Professional
(4)
Instructor was very knowledgeable and enthusiastic and answered questions effectively.
Reviews
Unconventional Resources Completion and Stimulation - URCS
Course rating
(4.0)
Based on 6 reviews
U.K. L&D Report: 2019 - Benchmark Your Workplace Learning Strategy

Are you curious about the L&D strategies of some of the U.K.'s top companies?

Find out what they're up to in findcourses.co.uk's second annual U.K. L&D Report!

uk-ld-report-2019

Learn more